Internally the attention to total accessibility integration includes disabled facilities and unobstructed level access to all areas, with an elevated disabled viewing platform on first floor concourse level.

The design embraces energy efficient measures and passive strategies to minimise the need for supplementary heating, cooling and lighting. The main roof housed a large PV array providing supplementary electricity and integrates a rainwater harvesting system, used to flush toilets and irrigate the pitch.

Inclusive access was a core consideration. The careful design ensures people can move without difficulty between the highway, external public zones and through the building.